The Challenge:

Turkey Point, ON

Grassmere had to work over top of new foundations and pits to accommodate fish tanks, while also dealing with varying ground elevation. Multiple disciplines and stakeholders were involved, including the owner, a consultant and the general contractor.

The Grassmere Solution:

Grassmere supplied and erected this structure using the CORR-SPAN solution from Behlen Industries. This project was self-performed through our “sister” erection company, KDM Erectors.

The Result:

The 28,000 square foot facility has no interior columns and is supported by the walls, ceiling and truss system, which creates the curved roof. The energy efficiency of the building was enhanced with spray foam insulation on the ceiling and walls.

This great looking new fish hatchery was finished safely and on schedule.

Basic Specifications:

Client:

Normandale Fish Hatchery

Location:

Turkey Point, ON

Project Description:

New fish hatchery and office complex

Construction Services:

Bid Spec, evolved into Pre-Engineered building

Sector Served:

Industrial

Completion Date:

Fall, 2014

Total Square Feet:

27,000

Structural Systems:

CORR-SPAN from Behlen Industries

Roof System:

Curved C545 panel, 18 gauge

Roof Insulation Type and Thickness:

Spray foam insulation on top on metal ceiling liner

Wall System:

C545 wall panel with interior liner system

Wall Insulation Type and Thickness:

Spray foam insulation

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

Let’s Discuss Your Project. Request a Consultation Today!

Completed Projects

The old metal roof was in need of a replacement. Grassmere Construction...

We worked with the client on several different designs in order to achieve...

75,000-square-foot airplane hangar at Hamilton...

To construct three (3) building additions to a fully operational facility...

To give a façade facelift and roof retrofit to two pre-engineered buildings...

With a tight schedule and during a very cold winter, Grassmere...

The challenges in erecting this warehouse included scheduling...

Grassmere had to work over top of new foundations and pits...

As part of a Phase II renovation for Siemens’ Energy Blade Plant...

Grassmere had to tie-in a new pre-engineered structure to an existing...

Start your Project Today

Request a Consultation