Cold Storage Building Expansion

Alymer, ON

Grassmere is in the process of installing a 10,550 sf Butler pre-engineered metal building addition for Vermeer Orchards agricultural cold storage facility located in Alymer, ON. 

Basic Specifications:

Client:

Vermeer Orchards

Location:

Alymer, ON

Project Description:

Grassmere is supplying and installing a 10,550 sf Butler pre-engineered building addition

Construction Services:

Project Management

Sector Served:

Industrial

Completion Date:

Fall 2021

Total Square Feet:

10,550

Structural Systems:

Butler Pre-Engineered Building

Roof System:

Butlerib II™

Roof Insulation Type and Thickness:

6" (R19) Metal Building Insulation (MBI)

Wall System:

Butlerib® II

Wall Insulation Type and Thickness:

4" (R13) Metal Building Insulation (MBI)

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

Let’s Discuss Your Project. Request a Consultation Today!

Completed Projects

Aylmer Public Works Building

This project was challenging in that we were to construct...

As part of a Phase II renovation for Siemens’ Energy Blade Plant...

Grassmere was contracted to supply and install a complex pre-engineered...

Grassmere was contracted to build a new corporate building...

Start your Project Today

Request a Consultation