The Challenge:
Grassmere was contracted to build a new corporate building in an existing parking lot. There was a tight schedule and we were told not to exceed a maximum allocated cost.
The Grassmere Solution:
We were able to fast track Phases II and III, which reduced the amount of time and allowed us to meet the budget.
The Result:
The final architectural outlook was very satisfying to the customer, and Grassmere finished on time and within budget.
Basic Specifications:
Client: Cargill Location: London, ON Project Description: New corporate offices Construction Services: Project Management Sector Served: Industrial Project Completion Date: July, 2011
Total Square Feet: 5,800 Structural Systems: Conventional structural steel Roof System: Single-ply membrane Roof Insulation Type and Thickness: N/A Wall System: 3" thick insulated metal panel Wall Insulation Type and Thickness: N/A