The Challenge:

Uxbridge, ON

The challenges in erecting this warehouse included scheduling, difficult weather conditions and meeting the customer’s specifications.

The Grassmere Solution:

Our direct customer (and the general contractor for the owner) Celotti Building Corporation, had a past association with Butler Manufacturing™. Based on their perception of Butler as a premium product, they selected the Grassmere’s Butler proposal over the competition, despite the fact we were not the lowest price.

Grassmere provided a cost-effective pre-engineered building solution. We were able to self- perform the work through our “sister” erection company, KDM Erectors.

This Butler building solution included Shadowwall™ wall cladding and the MR-24® standing seam roof system.

The Result:

The customer was very pleased with the great job we did erecting the warehouse.

Grassmere was subsequently awarded and has completed the following additional Butler Buildings for Celotti:

  • A new, 25,000 square foot office and warehouse facility for KTI in Calgary, Alberta
  • An 11,000 square foot plant addition for K Line in Scarborough, Ontario

Basic Specifications:

Client:

KTI Ltd.

Location:

Uxbridge, ON

Project Description:

Supply and erect a warehouse

Construction Services:

Bid Spec, evolved into Pre-Engineered building

Sector Served:

Industrial

Completion Date:

October, 2014

Total Square Feet:

20,000

Structural Systems:

Butler Pre-Engineered Building

Roof System:

MR-24®

Roof Insulation Type and Thickness:

6"/R20 Metal Building Insulation (MBI)

Wall System:

Shadowall™

Wall Insulation Type and Thickness:

8"/R27 Metal Building Insulation (MBI) as well as Roxul insulation to fire-rated walls

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

Let’s Discuss Your Project. Request a Consultation Today!

Completed Projects

The old metal roof was in need of a replacement. Grassmere Construction...

We worked with the client on several different designs in order to achieve...

75,000-square-foot airplane hangar at Hamilton...

To construct three (3) building additions to a fully operational facility...

To give a façade facelift and roof retrofit to two pre-engineered buildings...

With a tight schedule and during a very cold winter, Grassmere...

The challenges in erecting this warehouse included scheduling...

Grassmere had to work over top of new foundations and pits...

As part of a Phase II renovation for Siemens’ Energy Blade Plant...

Grassmere had to tie-in a new pre-engineered structure to an existing...