Grassmere was the chosen proponent of a public tender request to perform the site development and construction of a turn-key 4,000 sf pre-engineered building expansion for Woodstock Transit.
Normandale Fish Hatchery




The Challenge:
Turkey Point, ON
The Grassmere Solution:
The Result:
The 28,000 square foot facility has no interior columns and is supported by the walls, ceiling and truss system, which creates the curved roof. The energy efficiency of the building was enhanced with spray foam insulation on the ceiling and walls.
This great looking new fish hatchery was finished safely and on schedule.
Basic Specifications:
Client: | Normandale Fish Hatchery |
Location: | Turkey Point, ON |
Project Description: | New fish hatchery and office complex |
Construction Services: | Bid Spec, evolved into Pre-Engineered building |
Sector Served: | Industrial |
Completion Date: | Fall, 2014 |
Total Square Feet: | 27,000 |
Structural Systems: | CORR-SPAN from Behlen Industries |
Roof System: | Curved C545 panel, 18 gauge |
Roof Insulation Type and Thickness: | Spray foam insulation on top on metal ceiling liner |
Wall System: | C545 wall panel with interior liner system |
Wall Insulation Type and Thickness: | Spray foam insulation |
Let’s Discuss Your Project. Request a Consultation Today!
Completed Projects
Goss Auto`s New Manufacturing Plant Strathroy-Caradoc, ON Grassmere
Grassmere has partnered with Progressive Industrial Fluids using the Design-Build...
Kaycan Building Expansion Barrie, ON Grassmere constructed two
Food Storage Warehouse Parry Sound, ON Grassmere has
Grassmere is in the process of installing a 10,550 sf Butler pre-engineered metal...
Grassmere is in the process of installing two Butler pre-engineered metal buildings...
The old metal roof was in need of a replacement. Grassmere Construction...
Grassmere has designed a 21,600 sf pre-engineered metal building that is currently...
We worked with the client on several different designs in order to achieve...
75,000-square-foot airplane hangar at Hamilton...
To construct three (3) building additions to a fully operational facility...
To give a façade facelift and roof retrofit to two pre-engineered buildings...
Grassmere had to work over top of new foundations and pits...
As part of a Phase II renovation for Siemens’ Energy Blade Plant...
Grassmere supplied and installed the 7,700 sf pre-engineered self-storage...
Grassmere had to tie-in a new pre-engineered structure to an existing...

Start your Project Today
Request a Consultation
-
49 North St. E. Tillsonburg, ON
N4G 1B4 - (877) 392.9766
- info@grassmere.com