The Challenge:
Grassmere was asked to renovate an existing facility and construct a new food processing plant. We had to build and install the freezer, coolers, the inside processing area and second floor offices.
The Grassmere Solution:
We erected a Butler building for the new processing plant. To keep within the budget and on schedule, we self-performed the project with our own forces.
The Result:
We completed the project on time and in compliance with CFIA rules and regulations.
Basic Specifications:
Client: Otter Valley Foods (Inovata) Location: Tillsonburg, ON Project Description: New federally inspected food plant Construction Services: Design Build Sector Served: Industrial Project Completion Date: April, 2013
Total Square Feet: 2,275, attached to an existing 30,000 square footage that was also built by Grassmere Structural Systems: Butler Pre-Engineered, complete with roof-top condenser platform Roof System: MR-24® Roof Insulation Type and Thickness: N/A Wall System: Butlerib® II Wall Insulation Type and Thickness: N/A