The Challenge:

Tillsonburg, ON

Grassmere was asked to renovate an existing facility and construct a new food processing plant. We had to build and install the freezer, coolers, the inside processing area and second floor offices.

The Grassmere Solution:

We erected a Butler building for the new processing plant. To keep within the budget and on schedule, we self-performed the project with our own forces.

The Result:

We completed the project on time and in compliance with CFIA rules and regulations.

Basic Specifications:

Client:

Otter Valley Foods (Inovata)

Location:

Tillsonburg, ON

Project Description:

New federally inspected food plant

Construction Services:

Design Build

Sector Served:

Industrial

Completion Date:

April, 2013

Total Square Feet:

2,275, attached to an existing 30,000 square footage that was also built by Grassmere

Structural Systems:

Butler Pre-Engineered, complete with roof-top condenser platform

Roof System:

MR-24®

Wall System:

Butlerib® II

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

Let’s Discuss Your Project. Request a Consultation Today!

Completed Projects

Kaycan Building Expansion Barrie, ON Grassmere constructed two pre-engineered building additions for Kaycan at their facility in Barrie, ON.  We also recladded

Grassmere Construction has torn down the existing office and is rebuilding...

We worked with the client on several different designs in order to achieve...

To construct three (3) building additions to a fully operational facility...

To give a façade facelift and roof retrofit to two pre-engineered buildings...

This design-build project had to maximize the area of potential...

Grassmere was asked to renovate an existing facility and construct...

Grassmere had to tie-in a new pre-engineered structure to an existing...

Grassmere took an existing metal recycling facility in Kentucky USA...

Start your Project Today

Request a Consultation