Grassmere Construction has torn down the existing office and is rebuilding a new 2,500 SF pre-engineered office on the existing foundations to support the client’s needs best. We will also be completing the office fit-out of the interior spaces and finishes.

Basic Specifications:

Client:

ASB Greenworld

Location:

Mount Elgin, ON

Project Description:

Office tear down, 2,500 sf rebuild, and fit out

Construction Services:

Design Build

Sector Served:

Industrial

Completion Date:

Ongoing

Total Square Feet:

2,500

Structural Systems:

Butler Pre-Engineered Building

Roof System:

MR24 Standing Seam Roof System

Roof Insulation Type and Thickness:

14" (R33) Metal Building Insulation (MBI)

Wall System:

Shadowall™

Wall Insulation Type and Thickness:

2" (R6) Metal Building Insulation (MBI)

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

Let’s Discuss Your Project. Request a Consultation Today!

Completed Projects

Grassmere Construction has torn down the existing office and is rebuilding...

We worked with the client on several different designs in order to achieve...

To construct three (3) building additions to a fully operational facility...

To give a façade facelift and roof retrofit to two pre-engineered buildings...

This design-build project had to maximize the area of potential...

Grassmere was asked to renovate an existing facility and construct...

Grassmere had to tie-in a new pre-engineered structure to an existing...

Grassmere took an existing metal recycling facility in Kentucky USA...

Start your Project Today

Request a Consultation