ASB Greenworld Office Renovation

ASB Greenworld

Mount Elgin, ON

Grassmere Construction is tearing down the existing office and rebuilding a new 2,500 SF pre-engineered office on the existing foundations to support the client’s needs best. We will also be completing the office fit-out of the interior office spaces and finishes.

Let’s Discuss Your Project. Request a Consultation Today!

  • New Office Drawing

Basic Specifications:

Client: ASB Greenworld
Location: Mount Elgin
Project Description: Office tear down, 2,500 sf rebuild, and fit out
Construction Services: Design Build
Sector Served: Industrial
Project Completion Date: Ongoing


Total Square Feet: 2,500
Structural Systems: Butler Pre-Engineered Building
Roof System: MR24 Standing Seam Roof System
Roof Insulation Type and Thickness: 14" (R33) Metal Building Insulation (MBI)
Wall System: Shadowall™
Wall Insulation Type and Thickness: 2" (R6) Metal Building Insulation (MBI)