Archives

Bethel Pentecostal Church

Bethel Pentecostal Church

The Challenge: Working with the church’s board of directors, the challenge was to address the funds required versus the clients’ needs and wants. Under budget constraints, Grassmere worked with the client and determined the order of importance in terms of tasks. The Grassmere Solution: Grassmere had initially proposed a “partial” Butler solution, but as the […]

Read more
FedEx

FedEx

The Challenge: With a tight schedule and during a very cold winter, Grassmere was contracted to provide a cost-effective solution for a building that included wide-span bays.  A further challenge was to ensure that the building adhered to Supplementary Standard SB-10, Ontario’s enhanced energy efficiency requirements of the Ontario Building Code. The customer was a […]

Read more
KTI Ltd.

KTI Ltd.

The Challenge: The challenges in erecting this warehouse included scheduling, difficult weather conditions and meeting the customer’s specifications. The Grassmere Solution: Our direct customer (and the general contractor for the owner) Celotti Building Corporation, had a past association with Butler Manufacturing™. Based on their perception of Butler as a premium product, they selected the Grassmere’s […]

Read more
Ayr Arena

Ayr Arena

The Challenge: This arena project was pre-tendered prior to the construction drawings being completed, which meant we did not have the specs to work with. At the same time, we had to work in conjunction with multiple disciplines and stakeholders including the general contractor and the project’s architect. Scheduling and safety issues were also paramount. […]

Read more