Archives

Metal Reroof

Metal Reroof

Metal Over Metal Reroof Highland Patrol Yard Embro, ON The old metal roof is in need of a replacement. Grassmere Construction is removing the existing 6,800 sf roof down to the existing linear and replacing it with the MR-24 metal over metal roof system from Butler Manufacturing.

Read more
Resource Recovery Center

Resource Recovery Center

Resource Recovery Center Drumbo, ON Grassmere has designed a 21,600 sf pre-engineered building that is currently being erected. Following the completion of the building shell Grassmere will also be completing the 1,200 sf office fit-out.

Read more
GMI Building Addition

GMI Building Addition

The Challenge To construct three (3) building additions to a fully operational facility with significant truck traffic. The Grassmere Solution We simplified the on-site construction process by utilizing pre-engineered butler buildings. The Result Successfully constructed the building additions without any safety incidents or impacts on the operations of the client.

Read more
Bethel Pentecostal Church

Bethel Pentecostal Church

The Challenge: Working with the church’s board of directors, the challenge was to address the funds required versus the clients’ needs and wants. Under budget constraints, Grassmere worked with the client and determined the order of importance in terms of tasks. The Grassmere Solution: Grassmere had initially proposed a “partial” Butler solution, but as the […]

Read more
TLC Landscaping

TLC Landscaping

The Challenge: To give a façade facelift and roof retrofit to two pre-engineered buildings; an older 1960’s era Stran office building and a 1980’s-era Butler shop building. We worked with the client over a 9-month period as he did an exhaustive search of potential re-roof solutions, as well as various alternate architectural designs. There was […]

Read more
FedEx

FedEx

The Challenge: With a tight schedule and during a very cold winter, Grassmere was contracted to provide a cost-effective solution for a building that included wide-span bays.  A further challenge was to ensure that the building adhered to Supplementary Standard SB-10, Ontario’s enhanced energy efficiency requirements of the Ontario Building Code. The customer was a […]

Read more