Archives

Industrial Fluids Manufacturer

Industrial Fluids Manufacturer

Industrial Fluids Manufacturing Plant London, ON Grassmere has partnered with Progressive Industrial Fluids using the Design-Build method to develop, design and construct their new 33,000 sf manufacturing plant and office located in London, ON. 28,000 sf will be designated to the manufacturing process, and 5,000 sf will be designated to the office space.

Read more
Metal Over Metal Reroof

Metal Over Metal Reroof

https://www.youtube.com/watch?v=wKp-9QBxQ6E&t=7s Metal Over Metal Reroof Highland Patrol Yard Embro, ON The old metal roof was in need of a replacement. Grassmere Construction removed the existing 6,800 sf roof down to the existing linear and replaced it with the MR-24 metal over metal roof system from Butler Manufacturing.  

Read more
Resource Recovery Center

Resource Recovery Center

Resource Recovery Center Drumbo, ON Grassmere has designed a 21,600 sf pre-engineered metal building that is currently being constructed. Following the completion of the building shell Grassmere will also be completing the 1,200 sf office fit-out.

Read more
Fabrication Shop Building Addition

Fabrication Shop Building Addition

Fabrication Shop Building Addition Eden, ON We worked with the client on several different designs in order to achieve the width and height clearances required to service aircraft in this facility. This is one of several building additions Grassmere has completed for this client.

Read more
GMI Building Addition

GMI Building Addition

The Challenge To construct three (3) building additions to a fully operational facility with significant truck traffic. The Grassmere Solution We simplified the on-site construction process by utilizing pre-engineered butler buildings. The Result Successfully constructed the building additions without any safety incidents or impacts on the operations of the client.

Read more
  • 1
  • 2