Archives

Industrial Fluids Manufacturer

Industrial Fluids Manufacturer

Industrial Fluids Manufacturing Plant London, ON Grassmere has partnered with Progressive Industrial Fluids using the Design-Build method to develop, design and construct their new 33,000 sf manufacturing plant and office located in London, ON. 28,000 sf will be designated to the manufacturing process, and 5,000 sf will be designated to the office space.

Read more
ASB Greenworld Office Renovation

ASB Greenworld Office Renovation

ASB Greenworld Mount Elgin, ON Grassmere Construction has torn down the existing office and is rebuilding a new 2,500 SF pre-engineered office on the existing foundations to support the client’s needs best. We will also be completing the office fit-out of the interior spaces and finishes.

Read more
Law Office Renovation

Law Office Renovation

Law Office Renovation Tillsonburg, ON Grassmere was awarded the demolition and major exterior & interior renovation of a commercial office building. The challenge was combining two existing spaces into one functional law office over two storeys while highlighting the unique characteristics of the Victorian era building.

Read more
Fabrication Shop Building Addition

Fabrication Shop Building Addition

Fabrication Shop Building Addition Eden, ON We worked with the client on several different designs in order to achieve the width and height clearances required to service aircraft in this facility. This is one of several building additions Grassmere has completed for this client.

Read more
Lockhart’s Oddyssey Building Addition

Lockhart’s Oddyssey Building Addition

The Challenge To construct a significant building addition to a busy recreational vehicle dealership while ensuring the dealership remained entirely operational. The Grassmere Solution We utilized conventional masonry and structural steel construction that seamlessly match the existing building. The Result A complete upgrade to the entire facility to better serve their clients and employees.

Read more
GMI Building Addition

GMI Building Addition

The Challenge To construct three (3) building additions to a fully operational facility with significant truck traffic. The Grassmere Solution We simplified the on-site construction process by utilizing pre-engineered butler buildings. The Result Successfully constructed the building additions without any safety incidents or impacts on the operations of the client.

Read more
Bethel Pentecostal Church

Bethel Pentecostal Church

The Challenge: Working with the church’s board of directors, the challenge was to address the funds required versus the clients’ needs and wants. Under budget constraints, Grassmere worked with the client and determined the order of importance in terms of tasks. The Grassmere Solution: Grassmere had initially proposed a “partial” Butler solution, but as the […]

Read more
TLC Landscaping

TLC Landscaping

The Challenge: To give a façade facelift and roof retrofit to two pre-engineered buildings; an older 1960’s era Stran office building and a 1980’s-era Butler shop building. We worked with the client over a 9-month period as he did an exhaustive search of potential re-roof solutions, as well as various alternate architectural designs. There was […]

Read more
Metro Tool and Die Limited (MTD)

Metro Tool and Die Limited (MTD)

The Challenge: This design-build project had to maximize the area of potential plant expansion as efficiently as possible. Additional challenges included limited space on a tight site along with a fixed budget. The customer recognized that a Pre-Engineered Building was an economically viable option and approached Grassmere on the recommendation of one of our valuable […]

Read more
  • 1
  • 2